Work in progress
Haldimand Project (45% interest)
The Pétrolia-Junex-Gastem partnership has set itself the objective of outlining the extent of the productive horizons identified in the Pétrolia-Haldimand No. 1 well. The proposed work, with an estimated cost of M, comprises three separate phases:
Continuation of analyses and tests in the Pétrolia-Haldimand No. 1 well;
a 3-D seismic-survey program;
and finally Drilling of a second borehole targeting the productive zones already identified in the previous well.
Junex, as Operator, will be responsible for the work.
Drilling
Production Testing
Seismic Survey
Bourque project
Processing of a three dimensional (3D) seismic survey covering 60 km². Seismic lines are currently being opened, to provide the required access for the seismic acquisition equipment and sources.
Petrolia is the operator for this project.
Wells in Production
Previous works
Drilling
Pétrolia -Haldimand # 1 > Drilling finished Pétrolia - Le Ber > Drilling finished Pétrolia - Wakeham > Drilling finished
Seismic Survey
Gaspesia property
In December 2006, Pétrolia carried out a regional seismic campaign over 126 line km on the Gaspésia and Edgar properties. The principal objective of this completed regional seismic survey is to assess the lateral extension and depth of the Val-Brillant Formation. In order to develop this property, Pétrolia is following the recommendations of its consultants, Sproule & Associates, who conducted studies during 2003 and 2004.étrolia-Haldimand # 1 > 90 days of production test (July, 2006), Gaspé property
|
 |