Bourque 2 (Pinnacle reef)

3. Exploratory drilling

3.1 Site and road preparation
3.2 Drilling rig transport
3.3 Conductor casing
3.4 Drilling
3.5 Surface casing
3.6 BOP installation
3.7 Drilling
3.8 Logs
3.9 Drill stem tests
3.10 Casing
3.11 Tests conducted

As of December 19, 2012 : Tests will be conducted.

Bourque 1 (Barrier reef)

3. Exploratory drilling

3.1 Site and road preparation
3.2 Drilling rig transport
3.3 Conductor casing
3.4 Start of drilling
3.5 Surface casing
3.6 BOP installation
3.7 Drilling
3.8 Intermediate casing
3.9 Attaining the drilling objectives
3.10 Logs
3.11 Drill stem tests
3.12 Drilling
3.13 Drill stem tests
3.14 Results analysis
3.15 Production tests

As of December 19, 2012: Tests will be conducted.